Remington R300 Operations Instructions Page 15

  • Download
  • Add to my manuals
  • Print
  • Page
    / 24
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 14
15
119586
90˚
5. Push barrel into housing to the closed position.
6. Place
the muzzle of tool perpendicular to work surface
without tilting the tool. Push tool against work surface until
sliding action of barrel stops.
7. Bef
ore squeezing trigger, rotate safety ON/OFF switch to
the SAFETY OFF position. Squeeze trigger to set power
fastener. Be sure to keep pressure on tool during this op-
eration.
IMPORTANT: When tool is not in use, ALWAYS rotate
safety ON/OFF switch to the SAFETY ON position.
8. After
fastening is made, slide barrel forward rapidly. This
motion ejects the spent power load and resets the piston
for the next fastening. Make sure spent load has ejected
from tool.
Operation
S F
Safety OFF
Page view 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 23 24

Comments to this Manuals

No comments